Untitled Document
Home | Site Map | Contact | Text Size :
 
   
Companies still failing to comply with air conditioning inspection legislation - Cost Sector Catering
All uk buildings with air conditioning systems that have a capacity of over 12kw should have been inspected for energy efficiency by 4 january 2011.

The Heating and Ventilating Contractors' Association (HVCA) has received information from the Department for Communities and Local Government which indicates that the majority of such installations have still not been inspected and building owners are now breaking the law.

Apart from the potential penalties companies face, they are almost certainly paying higher energy bills by failing to have their systems inspected by experts who can advise on efficiency improvements.

Under the regulations all air conditioning systems with a cooling capacity over 12kW must be inspected.


All new systems put in place on or after 1 January 2008 are to be inspected within five years of installation, while all other air conditioning systems over 250kW output should have been inspected by 4 January 2009. Any air conditioning systems above 12kW should have been inspected by 4 January 2011.

The air conditioning report (ACR) produced by an accredited air conditioning assessor following the inspection will include recommendations about what changes should be made to the installation or how the system(s) could be run more efficiently.

By implementing these recommendations, businesses can save money and cut their carbon emissions – and meet many of their Corporate Social Responsibility (CSR) goals.

Rod Pettigrew, deputy chief executive of the HVCA, commented: "Non-compliance has real costs; it costs the environment, it will cost the UK any chance of meeting its emissions targets and it costs companies the opportunity to lower their costs – and in the difficult trading conditions being experienced by most businesses that must be sufficient incentive alone.


"It's worth emphasising that the inspection is not just a tick box exercise; it gives building owners and managers useful information about how their systems are running and how they could be improved both to reduce harmful carbon emissions and save them money on their energy bills."

For more information visit: www.hvca.org.uk

รายการข่าวอื่นๆ มีดังต่อไปนี้ :
Empire State Building Strikes Gold.
LG Electronics Unveils Multi V III, Its Most Advanced VRF Technology HVAC System.
Office workers reap healthy spin-offs from efficient building design.
Toshiba Introduces Voice-Controlled AND Energy-Efficient Air Conditioner
International Green Building Conference 2011 to Explore Innovative, Sustainable, and Actionable Green Building Solutions Especially for the Tropics and Sub-Tropics
Green building experts shop for ideas at Singapore’s first eco-mall
3rd floor of building L a model of green design
Global Air Conditioning Systems Market to Reach 144.30 Million Units by 2015, According to New Report by Global Industry Analysts, Inc.
2022 World Cup organizers determined to beat the heat.
IN TIME OF DROUGHT, RICE UNIVERSITY SAVING 12 MILLION GALLONS OF WATER A YEAR BY REUSING AIR CONDITIONING CONDENSATION, OTHER INITIATIVES
Taipei 101 is World’s Tallest Green Building
Effective office spaces
Tips from the repair man, how to keep your AC running smooth
Hospitals, Physicians Hustle to Prepare for Hurricane Irene
Local green building rules a better fit. US standard will be harder to achieve
Gardens are growing on green roofs around town
Dublin Building Wins Award For Being Environmentally Friendly
All govt offices to keep air-cond temperature at 24ºC from now
Broken air conditioning has students, teachers sweating
Agency: 440 sought hospital care for heat illness: Wichita, KS USA
มีหัวข้อข่าว 232 รายการ : 12 หน้า
Page << Back | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Next >>
   
 
 

        NEWS & EVENTS
บริการของบริษัท
- ระบบปรับอากาศขนาดใหญ่ ชิลเลอร์ CHILLER
- เครื่องทำลมแห้ง AIR DRYER
- รับออกแบบ ติดตั้ง บำรุงรักษา จัดหาอะไหล่ และซ่อมแซม COOLING TOWER
- งานท่อแอร์ และหุ้มฉนวนท่อ DUCT WORK and PIPING
- สินค้าชนิดพิเศษ Special Products
  more>>
สินค้า
- PE Series (Package)
- PE SERIES (Mr. SLIM)
- SE SERIES (Mr. SLIM)
- PS SERIES (Mr. SLIM)
- SL SERIES (Mr. SLIM)
  more>>
ลูกค้าที่ใช้บริการ


more>>
รูปแกลอรี่
- งานเปลี่ยน ท่อน้ำและวาล์วควบคุมระบบ Package Water Cooled
- งานเปลี่ยน Package Water Cooled ขนาด 25 Tons
- งานเคลือบผิวท่อด้วย Fiber Glass พร้อมทำสี
- งาน Overhual Motor & Pump ขนาด 125 HP
- งาน Overhual Motor & Pump ขนาด 125 HP
  more>>
11 Easy Ways to Be Greener on Earth Day
When is Earth Hour 2017? What is it and how you can get involved in the WWF 'blackout' event
Why changing your home's air filter is important
Could this tent make camping COMFORTABLE? £200 Siesta4 reflects sunlight and uses 'air conditioning' to keep it cool and dark - dailymail.co.uk
Decor choices affect indoor air quality - lfpress.com
  more>>



All Rights Reserved © 2011 Muang Thong Engineering (1998) Company Limited
40/5-6-7 Sukhumvit 71 Prakanongnue, Wattana, Bangkok 10110
Tel: 02 391 8027, 02 390 1242 Fax: 02 391 6100 E-mail: mte1998@gmail.com


cheap air jordans|pompy wtryskowe|cheap huarache shoes| bombas inyeccion|cheap jordans|cheap air max| cheap sneakers|wholesale jordans|cheap china jordans|cheap wholesale jordans|cheap jordans|wholesale jewelry china